GTE completed the communications design, drafting of P&IDs, preparation of control philosophy, control systems hardware design and procurement, PLC logic and SCADA programming and commissioning for this greenfields gold mine. The project was developed using ControlLogix PLCs and Citect 2018 and included controls for a SAG mill, ball mill, conveyors, pumps and power station. The project was delivered safely, successfully and on time.