Industrial Operator (Mining)
Ongoing
Paraburdoo, Western Australia
A critical upgrade to the process control network (PCN) was necessary at Paraburdoo to minimise the risk of potential downtime. The project aimed to replace aging and failing Hirschmann network switches with a new Cisco core backbone network, ensuring seamless endpoint migration while maintaining operational stability.
The client faced several pressing issues, including:
To mitigate these risks, GTE Group deployed a structured upgrade strategy tailored to the site’s needs which included:
The project delivered significant operational enhancements:
The expertise and experience gained from this project will guide the implementation of future PCN improvements, reinforcing GTE’s position as a leader in industrial network transformations.
If you’re ready to hear more about how we can help your business operate safely and sustainably, get in touch with us today.
1300 921 590
admin@gtegroup.com.au
Level 2
109 St Georges Terrace
Perth, WA, 6000
Australia
PO Box 7099
Cloisters Arcade
Western Australia, 6850
Experience efficiency, reliability, and innovation with our expert engineering solutions.
Let’s take your operations to the next level—contact us today!
At GTE we transform complex engineering challenges into seamless solutions for your peace of mind.
© 2026 GTE Group Pty Ltd | All Rights Reserved | Powered by Design Studio Perth