BHP
Test Lab Facilities
May 2021 – May 2024
GTE Offices – Perth, Western Australia
BHP needed a solution to test and validate key control systems and industrial network equipment before deployment in a live production environment. The challenge included verifying SCADA servers, PLC hardware and network switches, as well as simulating staged upgrades over time. GTE was tasked with ensuring seamless integration, preventing compatibility issues and avoiding production disruptions.
GTE faced the challenge of thoroughly testing and validating all critical control systems and network equipment for BHP. The complexity of the project was amplified by the need to replicate the exact conditions of the site environment in a controlled, off-site setting. We needed a solution that could anticipate and mitigate risks associated with extended shutdowns or hardware failures.
Specialised Test Lab Facility
We responded by designing and building a dedicated test lab in our Perth office. This facility mirrored the hardware and software configurations that would be deployed on-site, allowing us to conduct thorough testing of each device’s configuration, compatibility and integration. By creating an identical working environment, we ensured that all aspects could be fully tested, including those involving obsolete or end-of-life hardware.
Minimising Risks with Strategic Planning
Our approach included purchasing end-of-life equipment to test and de-risk the migration strategies, ensuring that any potential design flaws, software bugs or host incompatibility issues were identified and resolved well before site commissioning. The test lab’s capacity to simulate real-world conditions was critical in reducing risks and avoiding costly delays during time-sensitive shutdown windows.
Significant Risk Reduction
Through our test lab facilities, we provided BHP with a significant reduction in project risks. Our rigorous testing process identified and addressed potential issues before they could impact on-site operations, ensuring all equipment was fully compatible and ready for deployment.
Operational Continuity and Long-Term Benefits
The test lab played a pivotal role in preventing extended shutdowns and minimising downtime. Over a period of 3 years, GTE’s facility was instrumental in testing and staging upgrades for over 60 shutdowns at BHP WAIO, ensuring seamless transitions and operational continuity. This proactive approach also included reviewing the functionality of new end-of-life replacements, ensuring that all hardware and systems were fit for purpose for the next 10 to 15 years.
"Over 60 BHP equipment installs tested and de-risked in GTE’s Perth lab, ensuring seamless integration, preventing extended shutdowns and achieving zero downtime over 3 years."
If you’re ready to hear more about how we can help your business operate safely and sustainably, get in touch with us today.
1300 921 590
admin@gtegroup.com.au
Level 2
109 St Georges Terrace
Perth, WA, 6000
Australia
PO Box 7099
Cloisters Arcade
Western Australia, 6850
Experience efficiency, reliability, and innovation with our expert engineering solutions.
Let’s take your operations to the next level—contact us today!
At GTE we transform complex engineering challenges into seamless solutions for your peace of mind.
© 2026 GTE Group Pty Ltd | All Rights Reserved | Powered by Design Studio Perth