Stockyard Interim Striker System

Project Details

Category

Control Systems

Location:

Western Australia

Project Overview

GTE were engaged by a client to install a stockyard interim striker system that restricts the movement range of mobile rail mounted machines.

The system allows users to safety isolate active mining areas without having to fully isolate the stockyard machines. The system works by stopping the long travel and slew motion drives at fixed positions using the interim strikers, which can quickly be locked into and out of service. The system was developed using Functional Safety principles as a Safety Integrity Level 1 (SIL1) system to the following standards: AS62061, ISO13849, AS61508, AS4024.

Outcome

The design outputs produced by GTE for the project included:

  • Stakeholder Requirements Specification
  • Design Basis Report
  • Functional Specification
  • HAZID workshop package and Formal Risk Assessment
  • Functional Safety Management Plan
  • Safety Requirements Specification
  • DFMEA Calculations
  • SIL Calculations
  • LOPA Analysis
  • ICAF Cost-Benefit Analysis and Report
  • Hardware Verification and Report
  • Technical Manual
  • Factory Acceptance Test Procedure
  • Commissioning/Validation Plan

We Want to Hear from You.

If you’re ready to hear more about how we can help your business operate safely and sustainably, get in touch with us today.

E-mail Head Office

admin@gtegroup.com.au

Physical Address

Level 2
109 St Georges Terrace
Perth, WA, 6000
Australia

Postal Address

PO Box 7099
Cloisters Arcade
Western Australia, 6850